Hybster Team
Hybster Industrialization
Industrialization - Qualification & Production Launch
The Hybster Industrialization team transforms a validated design into stable and cost-effective series production. They manage mould qualification, initial process parameter adjustments, part Cpk validation, the writing of manufacturing procedures, and the handover to the workshop. Their role is to eliminate risks before series launch.
Mould qualification
PPAP
Production prototype transfer
Initial capability
Manufacturing ranges