Design, industrialisation and manufacture
For the company The Tricolour Post Factory
As part of the development of the charging station «The Blue Boundary», we have accompanied The Tricolour Post Factory At each key stage of the project, from the initial idea to industrial production. This comprehensive support ensured technical choices were sound, deadlines were met, and resulted in a reliable, durable product that complies with the requirements for outdoor electrical applications.
Rigorous project management, focused on meeting deadlines
From the project's inception, a detailed and realistic schedule was established, incorporating the design, validation, industrialisation, and manufacturing phases.
Close coordination between the various stakeholders (design office, suppliers, industrial partners) has enabled:
-
to anticipate technical and industrial risks,
-
to secure the validation milestones,
-
to ensure the adherence to strict deadlines, an essential condition for the commercial launch of the product.
This structured approach ensured a smooth progression of the project, with no breaks between the development and production phases.
A full consideration of exhaustive and demanding specifications
The project The Blue Marker relied on a Precise and ambitious specifications, covering both the functional, regulatory, aesthetic and industrial aspects.
Every requirement has been analysed and integrated from the design phase:
-
Electrical and regulatory constraints,
-
outdoor usage conditions,
-
product ergonomics and design,
-
Maintainability and scalability.
This approach has enabled the design of a terminal perfectly aligned with market expectations and the objectives of The Tricolour Post Factory, while facilitating its industrialisation.
Controlled management of supplier relations and component sourcing
in-depth work has been carried out on the Sourcing components, cleverly combining local suppliers and partners in Asia.
This strategy has enabled:
-
to optimise costs without compromising on quality,
-
to secure critical supplies,
-
to reduce logistics times on sensitive parts.
Supplier relationship management was conducted with a view to sustainable partnership, involving rigorous quality monitoring and constant communication throughout the project.
Material choices suitable for electrical and outdoor constraints
The charging station being intended for a Outdoor use, The choice of materials has been given particular attention.
The criteria selected also included:
-
UV and weather resistance,
-
the mechanical and thermal properties,
-
Electrical safety,
-
durability and ease of maintenance.
These technical choices guarantee the product's long-term reliability, while meeting regulatory requirements and the constraints of exposed electrical equipment.
A secure project, from design to manufacture
Thanks to this comprehensive support, The Tricolour Post Factory possess today a robust, industrialisable charging station ready for controlled production.
The project «The Blue Boundary» illustrates our capability to transform a demanding specification into a finished industrial product, while adhering to deadlines, costs, and expected performance.
- Client
- The tricolour terminal is manufactured
- Year
- 2025
- Category:
- Electric mobility
- Conception
- Industrialisation:
- Injection moulds / Assembly tools
- Plastics engineering
- Decoration
- Laser Engraving / Stickers
- Packaging:
- Recycled cardboard

